The company expressed the need to entrust a singlecontractor with a complex improvement project for twosports fields, one at the JTC Continassa for the first team, and oneat the JTC Vinovo for the youth teams.
Amanagement with two simultaneous work teams was required, onmultiple shifts, including at night and on holidays.At the Vinovo field, the old surface turf was removedusing the Koro FTM sod remover. After adjustingthe subgrade, big-roll sod was laid,horizontal mixed synthetic turf (carpet).From the JTC Continassa field. Here, in fact, we wereengaged in big-roll sod removal using ourSod Harvester Magnum machine, from an existing mixed synthetic grass field.The work was carried out at night so as to immediately transport thesod to Vinovo during the cooler hours.
The installation team subsequently installed the newSport Turf on the JTC Continassa pitch. Juventus choseFor this pitch, the turf grown at our nursery.Production with a 100% silica sand substrate, meeting theUEFA quality standards.
The work was completed in just 10 days, working day and night,including holidays, to meet the tight deadline.Available.