Paradello oversaw the complete resurfacing of the pitch at theBergamo Stadium, bringing the field to a level of technical and performance excellence.
The project, which lasted a total of eight weeks, includedthe creation of an advanced construction system with verticaldrainage, new technological irrigation and heating systems, and the installation of alatest-generation hybrid turf, made with pre-cultivated Paradello sod andreinforced with synthetic fiber stitching. A new surfacecapable of guaranteeing safety, durability, and maximum performancefrom the first official match
The new field meets the highest international standards and allows intensive use, improving the quality of play and protecting athletes.